FastIns modular cleanroom|Medical_Pharmaceutical_Laboratory cleanroom|Cleanroom equipment supplier-Airkey Envirotech Co. Ltd

authentication

CONTACT US

Address:Room A405-A408, West Silicon Valley B, Bao'an Blvd, Bao'an District, Shenzhen City, China

Time:Monday to Friday
at 8:30am to 18:00pm

E-mail:sales@airkey.cn

(A)「Clean Room」Main Room It refers to the room for configuring of machinery and equipment and operating room based on productio

Unless planning of the plant as a whole, design of most domestic clean rooms has to compromise with established building environment, especially the planning on auxiliary room and machinery room of clean room, which is “saving as possible”; however, with improving standard for clean room, the area of auxiliary room and machinery room of the clean room may be ≥50% area of main room. Area ratio for installations in clean room of different cleanliness levels is shown in Fig. 3-2. Floor height and spatial height required for clean room of different cleanliness levels is shown in Fig. 3-3. The factors determinant of necessary area for installations in clean room is listed in Table 3-4 below.

Table 3-4 Determinant Factors of Area for Installations in Clean Room

Installation

Key factors determinant of area

Key factors specific to clean room

▫Main room of clean room

▫Configuration of machinery required by production plan

▫No impact on indoor air flow

 ▫Auxiliary room of clean room
·Changing room
·Rest room
·Washroom

·Front room to handling in materials

 

 ·Test area
·Shipment area
·Monitoring room, management room

 

▫Number of users
▫Duty form (Collective or partial rest)
▫Number of operators (Collective or partial rest)

▫Max. machinery and materials size
▫Quantity of machinery and materials
▫Duration of storage
▫Quantity of test machinery and materials
▫Logistics quantity
▫Area of controlling equipment and number of field executives

 

▫Anti-static clothing, separate keeping of common working clothes
▫ Additional area required for strengthening of air regenerating device
▫Additional area for installation of hand dryer after washing hand
(30 sec/person. Time)
▫Additional area for cleaning machinery and materials yard
▫Retention time considered for cleaning

▫Retention time considered for cleaning and washing

  ▫Management space

▫Required for common things, technical management and equipment management

▫Rest room, eating room etc required round-the-clock running

 

  ▫Equipment space

▫Machinery of cold and warm heat sources
▫Air handing unit, blowing fan
▫Air supply & exhaustion equipment
▫Water supply & drainage treatment equipment
▫Warehouse of hazardous materials
▫Area occupied for piping & wiring

▫Space required for examination and maintenance
▫Space reserved for prospective extension

 


FastIns Modular Cleanroom SolutionGlobal Customer Coverage, Performance Demonstrates Strength

sales@airkey.cn