+86-755-86193786

Search

FOLLOW US:

Copyright © 2016 Airkey All Rights Reserved 粤ICP备12042579号 Powered by shenzhen.300.cn 

Search

CONTACT US

Add:
Room A405-A408, West Silicon
Valley B, Bao'an Blvd, Bao'an
District, Shenzhen City, China

Monday to Friday
at 8:30am to 17:30pm

Tel:+86-755-86193786
Fax:+86-755-86193756

E-mail:

ENGINEERINGS

PRODUCTS

>
>
>
AIR SHOWER ASSEMBLY LINE

AIR SHOWER ASSEMBLY LINE

Min. Order:
≥1 set
Certification:
CE, ISO9001:2008, TUV certificate
Packaging Details:
Standard export packing (Bubble+foam+Carton+plywood case) or as client required
Delivery Detail:
Within 20 working days after receiving deposit
Remark:
Available in painted cold roll steel construction and SUS201 construction
Technical Information
Gallery
Brief introduction

Brief introduction

The equipment is to prevent air pollution brought from outside and achieve cleaning during goods delivery process; It can effectively remove dusts on the materials and avoids the dusts being brought into cleanroom. The airflow is driven by efficient centrifugal fan and circularly filtered by HEPA filter.

This equipment is widely used in PCB, IC, LCD, glass production, biological laboratories, pharmaceutical, hospitals, food processing and so on.

Technical Parameters:

 

MODEL APB60-E/LPB60-E
ExternalDinension                W×D×H(mm) 1400×3100×1660
InternalDinension               W1×D1×H1(mm) 900×1000×400
Air Veloctity(m/s) 20-24
Number of Nozzles 18
Voltage 1P,220V,50Hz/AC
Power Cord(mm) 800L
HEPA Filter Size(mm) 600×600×69
QTY 2pcs
Efficency 99.99%@0.3µm
Prefilter Launderable Non-Woven
Construction-External Electrogalvanize Metal Sheet
Construction-Internal Stainless Steel
Color Buff027(Optional)
Finishing Powder Coating

 

Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
please try again.

Related Product

Min. Order
≥1 set
Certification
CE, ISO9001:2008, TUV certificate
Packaging Details
Standard export packing (Bubble+foam+Carton+plywood case) or as client required
Delivery Detail
Within 25 working days after receiving deposit
Remark
Available in painted cold roll steel construction and SUS201 construction
I want to make an inquiry
Key words
Min. Order
≥1 set
Certification
CE, ISO9001:2008, TUV certificate
Packaging Details
Standard export packing (Bubble+foam+Carton+plywood case) or as client required
Delivery Detail
Within 25 working days after receiving deposit
Remark
Available in painted cold roll steel construction and SUS201 construction
I want to make an inquiry
Key words
Min. Order
≥1 set
Certification
CE, ISO9001:2008, TUV certificate
Packaging Details
Standard export packing (Bubble+foam+Carton+plywood case) or as client required
Delivery Detail
Within 10 working days after receiving deposit
Remark
Available in painted cold roll steel and SUS201 material
I want to make an inquiry
Key words
Min. Order
≥1 set
Certification
CE, ISO9001:2008, TUV certificate
Packaging Details
Standard export packing (Bubble+foam+Carton+plywood case) or as client required
Delivery Detail
Within 10 working days after receiving deposit
Remark
Painted cold roll steel material
I want to make an inquiry
Key words
Min. Order
≥1 set
Certification
CE, ISO9001:2008, TUV certificate
Packaging Details
Standard export packing (Bubble+foam+Carton+plywood case) or as client required
Delivery Detail
Within 15 working days after receiving deposit
Remark
Available in painted cold roll steel construction and SUS201 construction
I want to make an inquiry
Key words